Home / Guidelines & Products
M11 – Clinical electronic Structured Harmonised Protocol (CeSHarP)
Guideline number: M11
Status: Implementation (Step 5)
Adopted (Step 4): 19 November 2025
This topic was endorsed by the ICH Management Committee in November 2018. This new guideline is proposed to provide comprehensive clinical protocol organisation with standardised content, with:
- A Template which presents the format and structure of the protocol, including the table of contents, common headers, and contents;
- A Technical Specification which presents the conformance, cardinality, and other technical attributes that enable the interoperable electronic exchange of protocol content.
The Technical Specification document and Template had reached Step 2b on 27 September 2022 and entered public consultation. They have been updated by the M11 EWG following the comments received. The Technical Specification is now being submitted for a second round of public consultations, and the Template is provided as a support to the consultation.
The ICH Harmonised Guideline was finalised under Step 4 in July 1997. This document covers the preclinical safety testing requirements for biotechnological products. It addresses the use of animal models of disease, determination of when genotoxicity assays and carcinogenicity studies should be performed, and the impact of antibody formation on duration of toxicology studies.
An addendum was proposed to provide clarification on S6 and an update of the following topics discussed in the original ICH S6 Guideline: species selection, study design, immunogenicity, reproductive and developmental toxicity and assessment of carcinogenic potential. The Harmonised addendum provides further complementary guidance to the S6 Guideline and helps to define the current recommendations and reduce the likelihood that substantial differences will exist among regions.
The addendum reached Step 4 of the harmonisation process in June 2011 and was integrated as part II in the core Guideline that was then renamed S6(R1).
Q+A
Q+A Status: Implementation (Step 5)